Asia Unique LED Lighting Co., Ltd.
Home  >  Products  >  Solutions  >  Emergency Lighting

Products

Solutions

>
<

STORM-AU02 Led Tri-Proof Light-Emergency


image.png


● lP65 - Waterproof, Dustproof, Moisture-proof

● High lumen efficiency 120Im/w

● Full PCB board and the diffuser is a whole part, no need to take the PCB apart but wire directly, much easier than the normal design

● Cables can be from the back or the two ends of the light, easy wiring

● Easy end clips, one step assembly

● With Safety cables, free your hands during the installation

● Can be Surface Mounted or Suspended

● Can be linked one to another

● CE, RoHS SAA& C-tick approved

● LiFePO4 Battery adopted, 3.5W run 3 hours

● Emergency Lumen 450LM ±5%

● 3 years warranty for whole lamp

● Single CCT & Tri-color available


Applications:

  ● Parking lots● Warehouses● Factories
  ● Tunnels● Basements● Lofts
  ● Balconies● Car washing stations


Specification Video Contact

Product Dimention

image.png


Technical Specifications

image.png


Packing information

image.png


Before installation, please read the instructions completely and carefully.

Wiring Diagream

image.png


Testing

When luminaire is permanently connected to mains supply, allow the luminaire to fully charge for 16 hours.

Conduct following tests once the battery has fully charged:


Test 1:

A commissioning discharge test must be carried out once the luminaire is connected to mains supply.

The emergency luminaire must remain illuminated for at least 2 hours after disconnection from the mains power.

NOTE: The luminaire works on standard power when connected to mains supply and switches to 3.5W power during. 

emergency mode operation.


Test 2:

Subsequent tests, performed every 6 months, require the luminaire to successfully operate in emergency mode for 90mins. 

NOTE: A record shall be maintained of all the discharge tests performed on site at all times.


Test Switch and LED Indicator:

The Test Switch and LED indicator on the luminaire provide an indication of the status of the luminaire during

testing and normal operation

image.png



Install Instruction


image.png

image.png



Please Note:

* Product must be installed by licensed electrician.

* Disconnect or turn off the power before installation.

* Verify the supply Voltage is the same as rated luminaire voltage.


Packing List (each inner box)

Tri-proof light: 1pcs

Screw: 6pcs

Brackets: 2pcs

Connector: 1pcs

Clip used to hold the wires: 1pcs


Installation caution

● Product must be installed by licensed electrician.

● Disconnect or turn off the power before installation.

● Verify the supply Voltage is the same as rated luminaire voltage.


Application:

image.png


X

Leave a Message
we will get back to you ASAP !